52词语>英语词典>lock chamber翻译和用法

lock chamber

英 [lɒk ˈtʃeɪmbə(r)]

美 [lɑːk ˈtʃeɪmbər]

网络  闸室

英英释义

noun

  • enclosure consisting of a section of canal that can be closed to control the water level
      Synonym:lock

    双语例句

    • Technical measures taken for the Zaohe3rd lock chamber are discussed in view of the construction characteristics and thorny problems and according to the construction procedure.
      针对皂河三线船闸闸室施工特点、难点,依据闸室施工工序,提出了应采取相应技术措施施工。
    • Anti-seepage treatment on structural joints in the fourth lock chamber northern in TGP
      三峡永久船闸北线四闸室结构缝防渗处理
    • The Analyses and Research on the Ultimate Bearing Capacity of Soil Layer Anchor Rod in Lock's Chamber Structure
      船闸工程土层锚杆的变形及设计承载力分析研究
    • The going forward and back of flaw-detecting system is controlled by the lock gear inner the chamber, and its velocity is adjusted by it.
      膛内定位机构控制系统前进与后退及调整运动速度。
    • Based on in situ tests, a technical line of protection at each level, construction with great care and controlling at every step is determined for the deep lock chamber trench excavation by blasting technique.
      爆破技术通过现地针对性试验,确立了层层保护,精雕细刻,步步控制的技术路线;
    • The lock is ship pass building which overcome the centralized water level difference formed by dam building ( or natural) on the river. The lock consists of head bay, trial bay, gates and lock chamber.
      船闸是克服河流上建坝(或天然)形成的集中水位差的一种过船建筑物,它由上下闸首、闸门、闸室等组成。
    • Test on Limiting Bearing Capacity of Soil Layer Anchor Rod of Lock Chamber Structure
      船闸闸室墙结构土层锚杆极限承载力试验
    • Based on the structure inner force calculation and analysis, emphasis on the development of the lock chamber reinforced concrete structure reinforcement design program, the reinforcement design intelligent and interactive is achieved.
      在结构内力计算分析的基础上,重点进行船闸闸室钢筋混凝土结构的配筋设计程序的编制,实现配筋设计智能化和交互性。
    • The realizable κ~ε turbulent model was used to carry out the unsteady calculation about the simulation system which was composed by batch handling lock hopper and scrubbing cooling chamber. The result of numerical simulation agrees well with the operation value.
      在由间歇排渣型锁斗和洗涤冷却室组成的模拟系统中,应用Realizableκ~ε湍流模型进行了非稳态计算,得到的计算结果和实际情况比较吻合。
    • This paper introduces the technology of anti-seepage treatment on structural joints in the fourth lock chamber northern in TGP's permanent lock, mainly states the technique and material used in project as well as construction process.
      本文介绍了三峡永久船闸北线四闸室结构缝防渗处理工程中处理的工艺、使用的材料、施工的过程。